Swanbank Water Treatment Plant

Project Description

Stage 1 - included the design and construct of a new Demineralised Water Treatment Plant incorporating multiple pre - filtration and RO / CEDI trains to produce a high quality boiler feed water for the gas fired E stations heat recovery steam generators.

Stage 2 - included the design and construct of a new package STP to treat waste steams from the existing park facilities.

Stage 3 - Includes the design and construct of a new floating raw water intake system and pump station on the lake, rising main and building to house equipment. 

Project Details

Client: Stanwell Corporation 
Contract system:Design and Construct 
Contract sum:$6.2 Million 
Completion date:

 March 2013