Stirloch Logo cropped 2
Queensland
+61 7 3393 2860

Nabiac WTP

PROJECT DESCRIPTION

The Nabiac Water Treatment plant is a new purpose built 24ML per day plant treated raw water provided from a network of ground water bores.  The project included the construction of a 70m x 15m plant building to facilitate the operation of the Primary and secondary Membrane filtration units, backwash systems, auto filtration, and chemical dosing for the plant including ACH, Fluoride, Gas Chlorination, Potassium Permanganate, as well as secondary transfer pump stations, 10 ML Reservoir, Lime silo, Administration building, all associated pipeworks, roadworks, electrical and control systems.

PROJECT DETAILS

Client Mid Coast Water
Contract system Construct Only
Contract sum $10.0 Million
Completion date April 2018
Project location Nabiac, New South Wales
© 2014 | Site Map | Web Design Brisbane by iFactory